Save yourself from heavy carrying on construction sites! No matter if you work on new buildings or restructuring: the mini construction lift can be applied nearly everywhere! These are some examples for the possible application of our mini construction lift.

Support foot Support foot

A small support foot is used for mounting the construction mini-lift on a scaffold (included).

Mounting the support foot Mounting the support foot

The small support foot is mounted below the front. This ensures the load transfer to the scaffold.

The rear The rear

The mini construction lift is secured on the rear. Drill 10 mm and set dowel.


Tighten strap Tighten strap

Subsequently, tighten with a strap.

Ready for use! Ready for use!

The mini construction lift Flipper is ready for use!

Balcony door Balcony door

The first balcony door arrives.


Use on multiple floors Use on multiple floors

Windows are delivered to the lower floors without switching the setup of the mini construction lift.

Balcony door Balcony door
Balcony door frame Balcony door

Balcony door frame Balcony door frame

The frame of a balcony door is mounted.

Balcony door frame Balcony door frame
Balcony door frame Balcony door frame

The balcony door frame is pulled over the scaffold. Now loosen the straps – the rest is a piece of cake.


Special brushes Special brushes

Thanks to special brushes (white), the valuable surfaces of your goods stay unharmed.

Lashing strap Lashing strap

The lashing strap is fastened on props. Therefore, the mini construction lift lies safely on the scaffold.

Application on the scaffold Application on the scaffold

In this situation, the construction lift is placed on the scaffold, the rear legs are folded in. A lashing strap is added on the rear to avoid tipping. Squared timber is added to the front to ensure a good load transfer. The lashing strap is fixed on the props, ensuring a safe mounting.


Application in interior spaces Application in interior spaces

The mini lift Flipper can even be used in finished rooms with carpeting and windows. Thanks to special brushes, the surfaces stay unharmed.

Window installation in a commercial hall Window installation in a commercial hall

Windows were installed in a commercial hall with offices. Even here, the mini construction lift could be used. The window panes were not large, but there were many of them. Thus, we lifted several panes at once. Cork protected the panes, even in horizontal position.

Switching glass panes Switching glass panes

The construction lift is also suitable for easily breakable glass. In this example, a lift-up sliding door was installed on the first floor. Four month later, the glass pane had to be exchanged due to damage. The new glass pane weighs 95 kg and cannot be transported through the staircase – the Flipper construction lift transported the new pane and removed the old, damaged one in only 20 minutes, including installation and removal of the lift.


Height difference between scaffold and floor Height difference between scaffold and floor

In this situation, the scaffold is lower than the floor. Through removing the upper scaffolding pole, a safe installation is possible.

Interior doors to the upper floor Interior doors to the upper floor

For this project, we could park under the loggia and lift the doors immediately up and inside.

Apartment building – lifting doors with the construction lift Apartment building – lifting doors with the construction lift

13 acoustic doors (65 kg each) and 55 chipboard doors (30 kg each) were delivered that day.


Apartment building 3 hours later Apartment building 3 hours later

One worker downstairs, one upstairs, and all doors could be lifted to their destination. The construction lift lifted 2 acoustic doors or 5 chipboard doors at once.

Application on apartment building Application on apartment building

For this project, 280 doors should be installed. The lift of the apartment house was out of order, the doors had to be installed on the third floor. No problem for the mini construction lift!

Even suitable for narrow openings Even suitable for narrow openings

Here, the loggia was so narrow that the doors had to be lifted upright. Still, 32 chipboard doors and 4 fire-resistant doors (65 kg each) could easily be transported to the first floor within 2 hours.